Home | Intro | All Urban PV Projects | Best Practices | PV Communities | BIPV Products | Links | Credits

BI PV Project Summary
 
KW-dorferbach_01_id727.jpg
Name projectPower Plant Dorferbach
CountryAustria
Year2006-08 (Start operation date)
PV applicationFaçade - integrated in glass system (no see through)
PV power total2.83 kWp
LocationPrägraten, Tyrol
Latitude/Longitude47°1'0"N 12°22'32"E
SummarySince autumn 2006 the green electricity power plant delivers about 40 million kWh electricity per year. For the first time in power plant construction a PV-system was integrated in the operations building. Therefore this innovative power plant will use the hydro power and otherwise also directly the sun power.
Keywords(bipv) building integrated pv

PicturesPDF'sCase studiesDetails