Home | Intro | All Urban PV Projects | Best Practices | PV Communities | BIPV Products | Links | Credits

BI PV Project Summary
 
energieburo_WAID_kl.jpg
© energieb├╝ro┬« ag
Name projectMunicipal hospital Waid, Zurich
CountrySwitzerland
Year2000-01-01 (Start operation date)
PV applicationInclined roof - integrated
PV power total54 kWp
LocationZurich
Latitude/Longitude47°23'55.21"N 8°31'15.76"E
SummaryOn 408m2 southfacing roof top crystalline PV modules were installed forming a watertight roof covering over a base of slates. The power generated, which corresponds to an anually energy need of about 40 urban households, is fed directly in the Zurich city power net. It is an important step towards Zuric's future-oriented energy politics.
Keywords(PV) architecture, (bipv) building integrated pv

PicturesPDF'sCase studiesDetails