Home | Intro | All Urban PV Projects | Best Practices | PV Communities | BIPV Products | Links | Credits

BI PV Project Summary
 
070608Muggensturmklitzeklein1.jpg
© Tauber-Solar Management GmbH
Name projectHartmann AG
CountryGermany
Year2006-12-15 (Start operation date)
PV applicationFlat roof - mounted & mechanical fixing
PV power total3838 kWp
LocationMuggensturm, Baden-Württemberg
Latitude/Longitude48°52'0"N 8°17'0"E
SummaryThe third largest photovoltaic roof system of the world! In just 9 month without prepared work the photovoltaic system was constructed on an area of 80000m² as large as 16 football fields. Altogether there were build in 20900 monocrystalline modules with a power of 3839 kWp which leads to a reduction of 2100t carbon dioxide per year.
Keywords(PV) demonstration

PicturesPDF'sCase studiesDetails