Home | Intro | All Urban PV Projects | Best Practices | PV Communities | BIPV Products | Links | Credits

BI PV Project Summary
 
Newbiggin.jpg
© Newcastle County Council
Name projectNewbiggin Hall Estate
CountryUnited Kingdom
Year2004-06-01 (Start operation date)
PV applicationInclined roof - integrated
PV power total38.25 kWp
LocationNew Castle upon Tyne
Latitude/Longitude54°59'20"N 1°39'37"W
Summary25 flats in a low-rise block provide social housing within Westerhope in Newcastle Upon Tyne. Newcastle County Council (NCC) initiated a program of refurbishment which included re-roofing. This posed an ideal opportunity to integrate PV systems at the same time as combining it with other improvement work – including an upgrade of insulation, fire-stopping and an extensive over-hall of the external fabric of the building. The PV systems were installed with support from the Domestic Field Trials (DFT).
Keywords(bipv) building integrated pv

PicturesPDF'sCase studiesDetails